---
title: "BIM glossary: acronyms, terms and standards | B1P Group"
description: "BIM glossary: exchange information requirements, BEP, CDE, LOD, LOIN, IFC and other information management acronyms, with their standard and related service."
url: https://www.b1pgroup.com/en/bim-glossary/
lang: en
updated: 2026-11-20
---
# BIM glossary

The words of information management, each with the standard that defines it: from the exchange information requirements to the as-built model.

At a glance

The B1P Group BIM glossary explains the acronyms and terms of information management in construction with the standard that defines them: UNI 11337, UNI EN ISO 19650, UNI EN ISO 7817-1 and the Italian Public Contracts Code. Each entry says who does what and when, and links to the service or article that covers it in depth.

Updated 20 November 2026 · Technical review by Matteo Proia

## What is in this glossary?

Forty entries on information management in construction, in six groups: standards, project documents, professional roles, models, exchange formats and checks. For each entry we give the reference standard and the service or article that covers it in depth.

The definitions follow the Italian standards (UNI 11337), the European and international ones (UNI EN ISO 19650, UNI EN ISO 7817-1) and the Public Contracts Code. Where an Italian acronym has an ISO 19650 equivalent we give it, because tender documents use both.

**Entries**

40, in six groups

**Reference standards**

UNI 11337, UNI EN ISO 19650, UNI EN ISO 7817-1, Legislative Decree 36/2023 and Annex I.9

**Who it is for**

Designers, contractors and clients working with BIM requirements

## The entries from A to Z

- [ACDat](https://www.b1pgroup.com/en/bim-glossary/#cde)
- [Annex I.9 to the Public Contracts Code](https://www.b1pgroup.com/en/bim-glossary/#allegato-i-9)
- [As-built model](https://www.b1pgroup.com/en/bim-glossary/#as-built)
- [BCF (BIM Collaboration Format)](https://www.b1pgroup.com/en/bim-glossary/#bcf)
- [BEP (BIM execution plan)](https://www.b1pgroup.com/en/bim-glossary/#bep)
- [BIM (Building Information Modeling)](https://www.b1pgroup.com/en/bim-glossary/#bim)
- [BIM coordinator](https://www.b1pgroup.com/en/bim-glossary/#bim-coordinator)
- [BIM dimensions (4D, 5D, 6D, 7D)](https://www.b1pgroup.com/en/bim-glossary/#dimensioni-bim)
- [BIM execution plan (pGI)](https://www.b1pgroup.com/en/bim-glossary/#pgi)
- [BIM manager](https://www.b1pgroup.com/en/bim-glossary/#bim-manager)
- [BIM specialist](https://www.b1pgroup.com/en/bim-glossary/#bim-specialist)
- [BIM tendering specialist](https://www.b1pgroup.com/en/bim-glossary/#bim-tendering-specialist)
- [BIMGIS specialist](https://www.b1pgroup.com/en/bim-glossary/#bimgis-specialist)
- [CDE manager](https://www.b1pgroup.com/en/bim-glossary/#cde-manager)
- [Clash detection](https://www.b1pgroup.com/en/bim-glossary/#clash-detection)
- [COBie](https://www.b1pgroup.com/en/bim-glossary/#cobie)
- [Code checking](https://www.b1pgroup.com/en/bim-glossary/#code-checking)
- [Common data environment (ambiente di condivisione dei dati, ACDat)](https://www.b1pgroup.com/en/bim-glossary/#acdat)
- [Digital twin](https://www.b1pgroup.com/en/bim-glossary/#digital-twin)
- [Document sharing archive (archivio di condivisione documenti, ACDoc)](https://www.b1pgroup.com/en/bim-glossary/#acdoc)
- [Exchange information requirements (capitolato informativo, CI)](https://www.b1pgroup.com/en/bim-glossary/#capitolato-informativo)
- [Federated model](https://www.b1pgroup.com/en/bim-glossary/#modello-federato)
- [HBIM](https://www.b1pgroup.com/en/bim-glossary/#hbim)
- [IDS (Information Delivery Specification)](https://www.b1pgroup.com/en/bim-glossary/#ids)
- [IFC (Industry Foundation Classes)](https://www.b1pgroup.com/en/bim-glossary/#ifc)
- [Information requirements (OIR, AIR, PIR, EIR)](https://www.b1pgroup.com/en/bim-glossary/#requisiti-informativi)
- [ISO 19650](https://www.b1pgroup.com/en/bim-glossary/#iso-19650)
- [Levels of checking (LV1, LV2, LV3)](https://www.b1pgroup.com/en/bim-glossary/#livelli-verifica)
- [Levels of coordination (LC1, LC2, LC3)](https://www.b1pgroup.com/en/bim-glossary/#livelli-coordinamento)
- [LOD (level of development)](https://www.b1pgroup.com/en/bim-glossary/#lod)
- [LOG and LOI](https://www.b1pgroup.com/en/bim-glossary/#log-loi)
- [LOIN (level of information need)](https://www.b1pgroup.com/en/bim-glossary/#loin)
- [Model checking](https://www.b1pgroup.com/en/bim-glossary/#model-checking)
- [openBIM](https://www.b1pgroup.com/en/bim-glossary/#openbim)
- [Organisational act](https://www.b1pgroup.com/en/bim-glossary/#atto-di-organizzazione)
- [Pre-appointment BIM execution plan (oGI)](https://www.b1pgroup.com/en/bim-glossary/#ogi)
- [Scan to BIM and point cloud](https://www.b1pgroup.com/en/bim-glossary/#scan-to-bim)
- [UNI 11337](https://www.b1pgroup.com/en/bim-glossary/#uni-11337)
- [UNI 11337-7](https://www.b1pgroup.com/en/bim-glossary/#uni-11337-7)
- [UNI 11337-8 (formerly UNI/PdR 74)](https://www.b1pgroup.com/en/bim-glossary/#uni-11337-8)

## Which standards govern BIM in Italy?

The rules come from three sources: UNI standards, European and international standards adopted in Italy as UNI EN ISO and, for public works, the Public Contracts Code.

### UNI 11337

Italian series of standards on the digital management of information processes in construction. The parts used most are part 1 (models, drawings and information objects), part 4 (levels of development of objects), part 5 (information flows: exchange information requirements, BIM execution plans, CDE, checks), part 6 (a UNI/TR technical report on writing the exchange information requirements), part 7 (requirements for professional roles) and part 8 (the BIM management system of an organisation).

Standard: UNI 11337, parts 1, 4, 5, 7 and 8; UNI/TR 11337-6

Read more: [The standards of BIM consultancy](https://www.b1pgroup.com/en/bim-consulting/#norme) · [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/)

### UNI 11337-7

Part of the UNI 11337 series that sets out the knowledge, skills and competence of information management roles. The 2018 edition identifies four: BIM specialist, BIM coordinator, BIM manager and CDE manager. It is the reference for personnel certification. The revision, put out to public enquiry by UNI in 2026, proposes two new roles: BIM tendering specialist and BIMGIS specialist.

Standard: UNI 11337-7:2018; draft revision of UNI 11337-7

Read more: [BIM tendering specialist (article)](https://www.b1pgroup.com/en/bim-news/bim-tendering-specialist-the-new-role-proposed-by-uni-11337-7/) · [BIM training](https://www.b1pgroup.com/en/training/)

### ISO 19650

European and international series, adopted in Italy as UNI EN ISO 19650, on organising information across the whole life of an asset. Part 1 gives concepts and principles, part 2 covers the delivery phase, part 3 the operational phase, part 4 information exchange, part 5 information security and part 6, published in 2025, health and safety information.

It uses English acronyms that have their own names in Italy: EIR for the capitolato informativo, BEP for the offerta and the piano di gestione informativa, CDE for the ACDat.

Standard: UNI EN ISO 19650, parts 1, 2, 3, 4 and 5; ISO 19650-6

Read more: [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/) · [Process guidance framework (article)](https://www.b1pgroup.com/en/bim-news/process-guidance-framework-towards-a-simpler-iso-19650/)

### Annex I.9 to the Public Contracts Code

Annex to Legislative Decree 36/2023 that implements article 43 on the methods and tools of digital information management in construction. It states what the contracting authority must do before requiring BIM (staff training, hardware and software, the organisational act), what the exchange information requirements contain and which roles are needed.

Since 1 January 2025 BIM has been mandatory for public works with an estimated cost above 2 million euros, excluding ordinary and extraordinary maintenance of assets not built with BIM; below the threshold the contracting authority can still require it.

Standard: Legislative Decree 36/2023, art. 43 and Annex I.9

Read more: [The BIM mandate in public procurement (guide)](https://www.b1pgroup.com/en/bim-news/bim-mandate-in-italian-public-procurement-threshold-and-obligations/) · [BIM for clients](https://www.b1pgroup.com/en/markets/clients/)

### Organisational act

The document in which the contracting authority regulates its digital information management: it sets out roles, responsibilities, decision-making processes, information flows and standards, and is integrated with the authority's management and quality systems, if any. It is adopted before requiring BIM in a tender, together with the staff training plan and the hardware and software plan that the same Annex I.9 requires.

Standard: Legislative Decree 36/2023, art. 43 and Annex I.9

Read more: [BIM for clients](https://www.b1pgroup.com/en/markets/clients/) · [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/)

### UNI 11337-8 (formerly UNI/PdR 74)

The part of UNI 11337 that sets the requirements for an organisation's BIM management system, following the approach of management system standards: policy, processes, resources, checks and improvement. It has replaced UNI/PdR 74, the reference practice used until now to certify BIM management systems.

It certifies the organisation, not people: for people, UNI 11337-7 applies.

Standard: UNI 11337-8, which replaces UNI/PdR 74:2019

Read more: [UNI 11337-8 certification](https://www.b1pgroup.com/en/services/bim-management/uni-11337-8/)

## Which documents govern a BIM project?

A BIM project revolves around three documents, in this order: the client's exchange information requirements, the pre-appointment BIM execution plan submitted in the tender, and the BIM execution plan written after the contract award.

### Exchange information requirements (capitolato informativo, CI)

The document in which the client states what it wants to receive: objectives and uses of the models, level of information need, formats, roles, CDE rules, checks and delivery dates. The client writes it (in public works, the contracting authority) and it is part of the tender documents.

Tenderers do not write it: they respond to it with the pre-appointment BIM execution plan (oGI). In ISO 19650 it corresponds to the EIR.

Standard: UNI 11337-5 and UNI/TR 11337-6; Annex I.9 to Legislative Decree 36/2023; UNI EN ISO 19650-2 (EIR)

Read more: [Exchange information requirements (guide)](https://www.b1pgroup.com/en/bim-news/exchange-information-requirements-what-they-are-and-who-writes-them/) · [BIM tender support](https://www.b1pgroup.com/en/services/bim-tender-support/)

### Pre-appointment BIM execution plan (oGI)

The document in which the tenderer responds to the exchange information requirements during the tender: it explains how it will manage information, models, roles, tools and checks. The tendering firm writes it, it is part of the technical proposal and it is often scored.

It comes before the pGI. In ISO 19650 it corresponds to the BEP submitted before the appointment.

Standard: UNI 11337-5; UNI EN ISO 19650-2 (pre-appointment BEP)

Read more: [Pre-appointment BIM execution plan (article)](https://www.b1pgroup.com/en/bim-news/pre-appointment-bim-execution-plan-bep-contents-and-assessment/) · [BIM tender support](https://www.b1pgroup.com/en/services/bim-tender-support/)

### BIM execution plan (pGI)

The document the successful tenderer writes after the contract award, developing the plan submitted in the tender: roles and appointments, model structure, naming, levels by phase, delivery schedule, coordination, checks and CDE rules. It is submitted to the client, in public works to the contracting authority, and it is updated when the project changes.

In ISO 19650 it corresponds to the BEP after the appointment.

Standard: UNI 11337-5; UNI EN ISO 19650-2 (post-appointment BEP)

Read more: [BIM execution plan (guide)](https://www.b1pgroup.com/en/bim-news/bim-execution-plan-pgi-contents-and-timing/) · [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/)

### Common data environment (ambiente di condivisione dei dati, ACDat)

The platform where the project's models, data and documents are uploaded, reviewed, approved and archived, with permissions by role, information states (work in progress, shared, published, archived) and version tracking.

In public works the contracting authority adopts its own CDE, where official deliveries are made; in private contracts the exchange information requirements say who provides it and with which rules. ACDat is the name used by the Italian standards.

Standard: UNI 11337-5; UNI EN ISO 19650-1 and 19650-2 (CDE); UNI EN ISO 19650-5 for information security; Annex I.9 to Legislative Decree 36/2023

Read more: [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/)

### ACDat

Italian acronym for ambiente di condivisione dei dati, the common data environment (CDE) of UNI EN ISO 19650. Italian standards and the Public Contracts Code use ACDat; tender documents often show both acronyms for the same platform.

Standard: UNI 11337-5; UNI EN ISO 19650-1 and 19650-2

Read more: [Common data environment (glossary entry)](https://www.b1pgroup.com/en/bim-glossary/#acdat)

### Document sharing archive (archivio di condivisione documenti, ACDoc)

An archive where copies of the models and copies or originals of the deliverables on non-digital media, such as printed drawings and signed documents, are collected and shared in an organised way. UNI 11337-1 keeps it separate from the CDE, which manages data, models and deliverables in digital form.

Standard: UNI 11337-1 and UNI 11337-5

Read more: [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/)

### Information requirements (OIR, AIR, PIR, EIR)

They state which information is needed, by whom, when and in what form. ISO 19650 arranges them in levels: OIR for the organisation's objectives, AIR for asset management, PIR for the single project and EIR for the exchange with the appointed party. The EIR follows from the OIR, AIR and PIR, and in Italy it is the capitolato informativo; the deliveries follow from the EIR.

Standard: UNI EN ISO 19650-1 and 19650-2

Read more: [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/) · [Asset operation](https://www.b1pgroup.com/en/services/asset-management/)

### BEP (BIM execution plan)

In ISO 19650 it is the plan in which the appointed party explains how it will meet the information requirements. There are two versions: the one submitted before the appointment, which in Italy is the offerta di gestione informativa (oGI), and the one written afterwards, which corresponds to the piano di gestione informativa (pGI).

Standard: UNI EN ISO 19650-2

Read more: [Pre-appointment BIM execution plan (article)](https://www.b1pgroup.com/en/bim-news/pre-appointment-bim-execution-plan-bep-contents-and-assessment/)

## Who does what in information management?

UNI 11337-7 describes four roles, with the knowledge, skills and competences of each. Two more are proposed in the revision of the standard put out to public enquiry by UNI in 2026.

### BIM manager

Manager of digital processes. Works at organisation level: defines and runs the BIM processes, sets up exchange information requirements and BIM execution plans, chooses tools and rules, looks after training. Annex I.9 asks contracting authorities to appoint a manager of digital processes.

Certification of the person follows UNI 11337-7 and involves an exam.

Standard: UNI 11337-7

Read more: [BIM manager course](https://www.b1pgroup.com/en/training/bim-manager-course/) · [The role of the BIM manager (article)](https://www.b1pgroup.com/en/bim-news/the-role-of-the-bim-manager-in-italy/)

### BIM coordinator

Coordinator of project information flows. Works on a single project: applies the BIM execution plan, coordinates the discipline models, organises the checks for clashes and inconsistencies, follows the deliveries in the CDE. The technical point of reference between designers, contractors and client.

In public works Annex I.9 requires the contracting authority to appoint a coordinator of information flows for each project, within the team supporting the RUP (the person responsible for the procedure).

Standard: UNI 11337-7; Annex I.9 to Legislative Decree 36/2023

Read more: [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/) · [BIM modelling](https://www.b1pgroup.com/en/services/bim-modelling/)

### BIM specialist

Advanced operator of information management and modelling. Produces the models and objects of their discipline following the rules of the BIM execution plan, checks them before delivery and uploads them to the CDE with the right status.

Standard: UNI 11337-7

Read more: [BIM modelling](https://www.b1pgroup.com/en/services/bim-modelling/) · [BIM training](https://www.b1pgroup.com/en/training/)

### CDE manager

Manager of the common data environment. Configures and administers the CDE: folder structure, permissions by role, review and approval workflows, information states, security and retention. Annex I.9 asks contracting authorities to appoint this role.

Standard: UNI 11337-7; Annex I.9 to Legislative Decree 36/2023

Read more: [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/)

### BIM tendering specialist

A role proposed, together with the BIMGIS specialist, in the draft revision of UNI 11337-7 put out to public enquiry by UNI in 2026. It is dedicated to information management in tenders, where the exchange information requirements, the tender rules and the pre-appointment BIM execution plans must stay consistent with each other. Until the revision is published it remains a proposal.

Standard: Draft revision of UNI 11337-7

Read more: [BIM tendering specialist (article)](https://www.b1pgroup.com/en/bim-news/bim-tendering-specialist-the-new-role-proposed-by-uni-11337-7/) · [BIM tender support](https://www.b1pgroup.com/en/services/bim-tender-support/)

### BIMGIS specialist

A role proposed, together with the BIM tendering specialist, in the draft revision of UNI 11337-7 put out to public enquiry by UNI in 2026. The name points to the integration of information models and geographic data (GIS). Until the revision is published it remains a proposal: tasks and requirements will be those of the final text.

Standard: Draft revision of UNI 11337-7

Read more: [BIM tendering specialist (article)](https://www.b1pgroup.com/en/bim-news/bim-tendering-specialist-the-new-role-proposed-by-uni-11337-7/)

## How much information should a model contain?

A model is worth the information it holds and the use made of it: these entries help to ask for, and deliver, the right information.

### BIM (Building Information Modeling)

A way of working in which the asset is described by digital models made of objects with geometry and information, shared by those who design, build and operate it. It is not a piece of software: it is a way of producing, exchanging and checking information across the whole life of the asset, with rules written in the exchange information requirements and the BIM execution plan.

Standard: UNI 11337; UNI EN ISO 19650; Legislative Decree 36/2023, art. 43

Read more: [BIM consultancy](https://www.b1pgroup.com/en/bim-consulting/) · [BIM implementation](https://www.b1pgroup.com/en/services/bim-implementation/)

### LOD (level of development)

In UNI 11337-4 it is the scale describing how developed a digital object is, from A to G: A symbolic, B generic, C defined, D detailed, E specific, F as built, G updated during operation. Each level combines a geometric part (LOG) and an information part (LOI).

Abroad, LOD refers to different scales, for example from 100 to 500: what counts is always the standard cited in the requirements.

Standard: UNI 11337-4

Read more: [BIM modelling](https://www.b1pgroup.com/en/services/bim-modelling/)

### LOG and LOI

The two components of LOD in UNI 11337-4. LOG describes the geometric features of the object (shape, dimensions, position), LOI the non-geometric ones (materials, performance, manufacturer, maintenance). An object can have simple geometry and a lot of information, or the other way round: this is why the exchange information requirements can ask for them separately.

Standard: UNI 11337-4

Read more: [BIM modelling](https://www.b1pgroup.com/en/services/bim-modelling/)

### LOIN (level of information need)

Instead of a fixed scale, it defines for each delivery which geometric, alphanumeric and documentary information is needed, for what purpose, at which stage and for which actor. In this way the exchange information requirements ask only for what the intended use needs, without modelling more than necessary. The most recent requirements use it, often alongside LOD.

Standard: UNI EN ISO 7817-1:2024 (formerly UNI EN 17412-1); referenced by UNI EN ISO 19650

Read more: [BIM tender support](https://www.b1pgroup.com/en/services/bim-tender-support/) · [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/)

### Federated model

A model that brings together the models of the single disciplines (architecture, structures, building services) without merging them: each stays with its author and is updated on its own. It is used to coordinate the disciplines, check for clashes and read the asset as a whole.

Standard: UNI 11337-5 (coordination); UNI EN ISO 19650-2

Read more: [BIM modelling](https://www.b1pgroup.com/en/services/bim-modelling/) · [BIM model checking](https://www.b1pgroup.com/en/services/bim-model-checking/)

### As-built model

A model that describes the asset as it was built, with the changes made on site, delivered at the end of the works for acceptance testing and operation. In UNI 11337-4 it corresponds to LOD F, the object as built. Clients, in public works the contracting authorities, ask for it in the exchange information requirements, with the rules for updating it during the works.

Standard: UNI 11337-4 (LOD F); the project's exchange information requirements

Read more: [As-built model](https://www.b1pgroup.com/en/services/bim-for-construction/as-built/) · [As-built model after completion (article)](https://www.b1pgroup.com/en/bim-news/as-built-model-after-completion-what-contracting-authorities-require/)

### Scan to BIM and point cloud

A point cloud is the set of coordinates measured by laser scanning or photogrammetry, often with colour and intensity. Scan to BIM is modelling from that cloud: the survey is carried out by the appointed surveyor, then the model represents the existing conditions within the stated tolerance.

Standard: No dedicated standard: tolerances and levels are set in the exchange information requirements (UNI 11337-4 for LOD)

Read more: [BIM modelling from survey data](https://www.b1pgroup.com/en/services/scan-to-bim/) · [Scan to BIM (article)](https://www.b1pgroup.com/en/bim-news/scan-to-bim-from-point-cloud-to-bim-model/)

### Digital twin

A model of the asset connected to the data the asset produces in operation (sensors, management systems, maintenance work), which is updated over time and supports decisions. A BIM model frozen at handover is not a digital twin: it becomes one when it is connected to real data and to the operating processes.

Standard: No single standard; UNI EN ISO 19650-3 for information in the operational phase

Read more: [Digital twin](https://www.b1pgroup.com/en/services/asset-management/digital-twin/) · [Asset operation](https://www.b1pgroup.com/en/services/asset-management/)

### BIM dimensions (4D, 5D, 6D, 7D)

The dimensions of BIM beyond geometry. UNI 11337-1 defines them as follows: 4D time, 5D cost, 6D use, operation and maintenance, 7D sustainability. In other countries 6D and 7D are reversed, so the exchange information requirements should describe the use of the model, not just the label.

Standard: UNI 11337-1

Read more: [4D and 5D BIM](https://www.b1pgroup.com/en/services/bim-for-construction/4d-5d/) · [BIM for construction and as-built](https://www.b1pgroup.com/en/services/bim-for-construction/)

### HBIM

Historic (or heritage) BIM: BIM applied to historic buildings. The model is built from the survey and documents materials, construction phases, decay and interventions, with objects that are often unique rather than taken from a catalogue. It supports conservation, restoration and management of the asset.

Standard: No dedicated standard; UNI 11337 and UNI EN ISO 19650 for information management

Read more: [Cultural heritage](https://www.b1pgroup.com/en/sectors/cultural-heritage/) · [Stadio Flaminio (article)](https://www.b1pgroup.com/en/bim-news/the-conservation-plan-for-the-stadio-flaminio-presented-at-romes/)

## In what format are models exchanged?

Exchange between different software goes through open formats, which the Public Contracts Code makes mandatory in public works.

### IFC (Industry Foundation Classes)

The open, neutral buildingSMART format for exchanging models between different software. A model exported to IFC keeps geometry and information but loses the parametric behaviour of the source software: it can be viewed, checked and coordinated, but not edited like the native file. The versions in use are IFC 2x3, IFC 4 and IFC 4.3 for infrastructure.

gbXML is something else: it describes spaces, surfaces and openings for energy analysis, not the whole model.

Standard: UNI EN ISO 16739-1

Read more: [IFC (article)](https://www.b1pgroup.com/en/bim-news/ifc-the-universal-language-of-bim/) · [BIM model checking](https://www.b1pgroup.com/en/services/bim-model-checking/)

### openBIM

A way of working with open formats and standards (IFC, BCF, IDS) so that different software can be used without depending on a single vendor. In public works the Code requires interoperable platforms and open, non-proprietary formats, so the information stays readable for the whole life of the asset.

Standard: buildingSMART standards; Legislative Decree 36/2023, art. 43 and Annex I.9

Read more: [BIM implementation](https://www.b1pgroup.com/en/services/bim-implementation/)

### BCF (BIM Collaboration Format)

An open buildingSMART format for exchanging issues on models, such as a clash, a question or a correction, with the view, the elements involved and the status, without sending the whole model. It is the most common way of sharing the results of coordination and checking between different software.

Standard: buildingSMART standard

Read more: [BIM model checking](https://www.b1pgroup.com/en/services/bim-model-checking/)

### IDS (Information Delivery Specification)

A buildingSMART standard that describes, in a machine-readable file, which information an IFC model must contain: classes, properties, allowed values. A requirement of the exchange information requirements becomes a rule that can be checked automatically before delivery.

Standard: buildingSMART IDS 1.0 standard

Read more: [BIM model checking](https://www.b1pgroup.com/en/services/bim-model-checking/) · [Artificial intelligence for BIM](https://www.b1pgroup.com/en/services/ai-for-bim/)

### COBie

Construction Operations Building information exchange: a schema for handing over to the operator the data needed for maintenance (spaces, components, types, warranties, spare parts) as spreadsheets or IFC. It originated in the United States and is requested mainly in international contracts and when the model is used for asset management.

Standard: US national standard NBIMS-US

Read more: [Asset operation](https://www.b1pgroup.com/en/services/asset-management/) · [Property portfolio](https://www.b1pgroup.com/en/services/asset-management/property-portfolio/)

## How is a model checked?

Coordination and checking are two different things: the first solves problems while the models are being produced, the second records the state of a delivery.

### Clash detection

A check of geometric clashes between objects, usually from different models: a beam running through a duct, a service intruding into a passage. It distinguishes hard clashes from tolerance violations, such as maintenance clearances not respected. It is part of coordination, not the whole of model checking.

Standard: UNI 11337-5 (levels of coordination)

Read more: [BIM model checking](https://www.b1pgroup.com/en/services/bim-model-checking/) · [BIM modelling](https://www.b1pgroup.com/en/services/bim-modelling/)

### Model checking

Checking the model against rules: completeness of information, coding, consistency between objects, requirements of the exchange information requirements. It is done with software applying rules or IDS files and produces a report of non-conformities. It looks at the data too, not only at the geometry as clash detection does.

Standard: UNI 11337-5 (levels of checking)

Read more: [BIM model checking](https://www.b1pgroup.com/en/services/bim-model-checking/) · [BIM design verification (article)](https://www.b1pgroup.com/en/bim-news/bim-design-verification-a-complete-guide-for-professionals/)

### Code checking

Checking the model against codes and regulations, such as distances, heights, areas, fire safety or accessibility, with the rules translated into criteria the software can check. The BIM execution plan states who organises it: while the models are being produced it is usually the BIM coordinator, who chooses rules and tools and collects the results; in the independent check, the client or the checker it appoints.

Standard: UNI 11337-5 (levels of checking)

Read more: [BIM model checking](https://www.b1pgroup.com/en/services/bim-model-checking/)

### Levels of checking (LV1, LV2, LV3)

UNI 11337-5 distinguishes three levels of checking of data, information and content: LV1 is the internal formal check, LV2 the internal substantive check, LV3 the independent check, formal and substantive, carried out by a party other than the one that produced the models.

Standard: UNI 11337-5

Read more: [BIM model checking](https://www.b1pgroup.com/en/services/bim-model-checking/)

### Levels of coordination (LC1, LC2, LC3)

UNI 11337-5 distinguishes three levels of coordination: LC1 between objects of the same model, LC2 between different models, for example structures and building services, LC3 between the models and the documents not produced from the models, such as reports.

Standard: UNI 11337-5

Read more: [BIM modelling](https://www.b1pgroup.com/en/services/bim-modelling/) · [BIM management and information management](https://www.b1pgroup.com/en/services/bim-management/)

## The acronyms at a glance

The acronyms found most often in tender documents and requirements, with the full name and the standard. Each acronym links to its entry.

| Acronym | Full name | Standard |
| --- | --- | --- |
| [CI](https://www.b1pgroup.com/en/bim-glossary/#capitolato-informativo) | Exchange information requirements | UNI 11337-5, UNI/TR 11337-6 |
| [oGI](https://www.b1pgroup.com/en/bim-glossary/#ogi) | Pre-appointment BIM execution plan | UNI 11337-5 |
| [pGI](https://www.b1pgroup.com/en/bim-glossary/#pgi) | BIM execution plan | UNI 11337-5 |
| [CDE](https://www.b1pgroup.com/en/bim-glossary/#acdat) | Common data environment | UNI 11337-5 |
| [ACDoc](https://www.b1pgroup.com/en/bim-glossary/#acdoc) | Document sharing archive | UNI 11337-1 |
| [EIR](https://www.b1pgroup.com/en/bim-glossary/#requisiti-informativi) | Exchange information requirements, the capitolato informativo | UNI EN ISO 19650-2 |
| [BEP](https://www.b1pgroup.com/en/bim-glossary/#bep) | BIM execution plan, the offerta and the piano di gestione informativa | UNI EN ISO 19650-2 |
| [CDE](https://www.b1pgroup.com/en/bim-glossary/#acdat) | Common data environment, the ACDat | UNI EN ISO 19650-1 |
| [LOD](https://www.b1pgroup.com/en/bim-glossary/#lod) | Level of development of objects | UNI 11337-4 |
| [LOIN](https://www.b1pgroup.com/en/bim-glossary/#loin) | Level of information need | UNI EN ISO 7817-1 |
| [IFC](https://www.b1pgroup.com/en/bim-glossary/#ifc) | Industry Foundation Classes | UNI EN ISO 16739-1 |
| [BCF](https://www.b1pgroup.com/en/bim-glossary/#bcf) | BIM Collaboration Format | buildingSMART |
| [IDS](https://www.b1pgroup.com/en/bim-glossary/#ids) | Information Delivery Specification | buildingSMART |
| [LV](https://www.b1pgroup.com/en/bim-glossary/#livelli-verifica) | Levels of checking | UNI 11337-5 |
| [LC](https://www.b1pgroup.com/en/bim-glossary/#livelli-coordinamento) | Levels of coordination | UNI 11337-5 |

## Where are these words used?

- [**BIM tender support** Exchange information requirements, pre-appointment and post-appointment BIM execution plans, point by point.](https://www.b1pgroup.com/en/services/bim-tender-support/)
- [**BIM management and information management** Roles, CDE, rules and checks for the project.](https://www.b1pgroup.com/en/services/bim-management/)
- [**BIM manager course** Preparation for the UNI 11337-7 exam, with exchange information requirements and BIM execution plans.](https://www.b1pgroup.com/en/training/bim-manager-course/)

## The most frequent questions about BIM acronyms

### Who writes the exchange information requirements?

The client: in public works the contracting authority, which includes it in the tender documents. Tenderers do not write it: they respond to it with the pre-appointment BIM execution plan (oGI).

### Which comes first, the oGI or the pGI?

The oGI comes first, submitted in the tender as the response to the exchange information requirements. The pGI comes after the contract award: the successful tenderer writes it by developing the tender plan, and it becomes the reference for the whole project.

### Who owns the common data environment?

In public works it belongs to the contracting authority: Annex I.9 requires it to adopt its own common data environment, where official deliveries are made. In private contracts the exchange information requirements decide. Suppliers can also work in their own environments, but they deliver there.

### Does a model exported to IFC lose its information?

No: IFC keeps the geometry and the information of the objects, but not the parametric behaviour of the source software. The model can be viewed, checked and coordinated; to edit it as before you need the native file. How much is kept also depends on how the export is set up.

### What is the difference between LOD and LOIN?

LOD in UNI 11337-4 is a fixed scale of object development, from A to G. LOIN in UNI EN ISO 7817-1 is not a scale: for each delivery it states which information is needed, for what purpose and at which stage.

### Are coordination and checking the same thing?

No. Coordination solves problems while the models are being produced; checking records the state of a delivery against the rules. UNI 11337-5 keeps them separate, each with its own levels: LC1, LC2, LC3 and LV1, LV2, LV3.

## Is an acronym in the requirements unclear?

Send us the tender's exchange information requirements: we will tell you what they ask for, how to respond and how much BIM weighs in the bid.

[Request a meeting](https://www.b1pgroup.com/en/contact/#scrivi) [How to choose a BIM consultant](https://www.b1pgroup.com/en/bim-consulting/how-to-choose-a-bim-consultant/)
