In the next future, relationships between the citizen, or public-private client and governing institution, in terms of administrative procedures aimed at granting a license right or an administrative authorization for a BIM project, will be mediated by an IFC format model. The phases will correspond to the traditional ones but E-Permit, transformed into parameters all the information necessary to verify the correspondence to specific requirements of the Town Planning Regulation and inserted in the IFC model, will allow an automatic and complete control.
This will be very useful both for the designers, who can automatically verify that the draft project complies with the minimum requirements for receiving the qualifications, and for the Public Administration that will be able to implement an automatic control system for urban planning practices. The applicant can produce all the necessary documentation and data in a single operation, and so the paperwork, sent in digital form, will be automatically excluded, if it presents obvious defects at the first check performed to verify the formal and substantial correspondence of the data and documents.
Remarkable advantages in terms of saving time, costs and quality of the result.