Arch. Giodice participates in the presentation at the Campidoglio of the Conservation Plan of the Flaminio Stadium in Rome.

3 years of work, 1 Multidisciplinary BIM model. The ambition to work on a worldwide recognized icon of modern architecture in Rome. A multidisciplinary Conservation Plan, led by the Department of Structural Engineering and Geotechnics of the University of Rome that has as researcher Arch. Maurizio Giodice, one of our BIM Manager.

OUR BIM PROCESS FOR REAL-TIME RENDERING AND VIRTUAL REALITY: REVIT & ENSCAPE

The BIM process now represents a reality that is gradually consolidating in the design and management property panorama.

Integrated design and graphic outputs, such as Render and VideoRender, are often notthe result of a single process. Then, how can you stand in a panorama of software thattake advantage of the modeling already carried out for BIM design?
In answer come different solutions, with the widest and rosy promises, but it is necessary to study in depth the potential of the tools, and rationalize the choices according to the desired output and also the costs to be faced.