The strategic objectives of the project include:
Location: | Bahrain |
Year: | 2018-2019-2020 |
Services: | BIM LOD 400 |
Scope: | Detail Design STR ARC BIM Model LOD 400 2D Deliverables VR Model Review QTO & MTO |
BAPCO modernization Program – Image courtesy of: Bapco Website
It includes the following main units: Residue Hydrocracking, Hydrocracker, Hydro Desulfurisation Unit, Crude Distillation, Vacuum Distillation, Hydrogen Production, Hydrogen Recovery, Sulphur Recovery, Tail Gas Treatment, Sour Water Stripper, Amine Recovery, Bulk Acid Gas Removal, Sulphur Solidification units; Saturated Gas Plant; and Sulphur Handling Facilities. Utilities and offsites are also part of the scope.
Our activity in the BAPCO Modernization Project concerned architectural design and multidisciplinary coordination of the buildings in the refinery. substations, laboratories, guard houses and maintenance, for a total of 15 buildings designed entirely in BIM.
Clash Detection activities, as well as the export of QtOs and MtOs, have been performed not only at each deliverable, but especially throughout the entire design process, to keep the engineering of all disciplines and costs under control for each design change.
Personale 1
Hover Box Element
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Personale 2
Hover Box Element
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Progetto 1
Hover Box Element
Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.